Tag Archives: upgrading

Visit at Güstrow biogas plant + new assignment

Renewtec visited Bioenergy Park “Güstrow”, the world’s largest biogas plant based on energy crops, on the 23rd of September. The plant produces 460 GWh upgraded biogas per year. At present the upgraded biogas is injected in to the German natural gas grid.

SDC12490

Dr. Jochen Tilger, CEO Bioenergy Park “Güstrow” GmbH to the left and Dr. Jörgen Held in front of a truck delivering substrate to the plant. In the background the absorption and desorption columns of the upgrading plant (water scrubber) are visible.

 

 

The visit resulted in a new assignment where Renewtec will map LNG and LBG operators and activities in Sweden.

Bioenergy Park “Güstrow” GmbH has signed up as a gold sponsor of REGATEC 2014 and experiences from operating an industrial scale biogas plant will be presented at the conference.

REGATEC 2014 in good progress

We are happy to announce that REGATEC 2014 is in good progress. Already at this early stage several high profile speakers from Asia, America and Europe have confirmed their participation.

The speaker list is available at www.regatec.org/speakers

REGATEC 2014 has a technical and industrial focus and is directed towards microbial and thermo-chemical conversion of biomass and waste to biomethane. Don’t forget to mark 22-23 May 2014 in your calendar.