Renewtec visited Bioenergy Park “Güstrow”, the world’s largest biogas plant based on energy crops, on the 23rd of September. The plant produces 460 GWh upgraded biogas per year. At present the upgraded biogas is injected in to the German natural gas grid.
Dr. Jochen Tilger, CEO Bioenergy Park “Güstrow” GmbH to the left and Dr. Jörgen Held in front of a truck delivering substrate to the plant. In the background the absorption and desorption columns of the upgrading plant (water scrubber) are visible.
The visit resulted in a new assignment where Renewtec will map LNG and LBG operators and activities in Sweden.
Bioenergy Park “Güstrow” GmbH has signed up as a gold sponsor of REGATEC 2014 and experiences from operating an industrial scale biogas plant will be presented at the conference.